Company performance

2020-07-28 11:58:07 


Shanghai Tianji Metallurgical Engineering Technology Co., LTD
Continuous Casting Machine Project Performance Table

上海天绩冶金工程技术有限公司
连铸机项目业绩表
No.
序号
Customer Name
连铸机用户名称
Project Scope
工程范围
Machine Type
机型
Casting Section
浇注断面
Production
Time

投产时间
   1  Henan Jiyuan Iron and Steel Group
Co.,Ltd.

河南济源钢铁(集团)有限公司
Increase cross-section reconstruction of 180mm²
增加180方断面改造
R10m-8-8 150mm²165mm²180mm² 2019.01
   2  Shiheng Special Steel Group Co.,Ltd.
山东石横特钢集团有限公司
Speed-up modification for No. 3 continuous casting machine
3#
连铸机提速改造
R10m-6-6 165mm² 2019.02
   3  Shandong Xiwang Special Steel
Co.,Ltd.

山东西王钢铁有限公司
Major overhaul of No. 1 continuous casting machine (including pulling speed improvement)
1#
连铸机大修改造(提拉速改造)
R10m-6-6 165mm² 2019.06
   4  Shiheng Special Steel Group Co.,Ltd.
山东石横特钢集团有限公司
Construction of a new R10m-10-10 continuous casting machine
新建R10m-10-10连铸机
R10m-10-10 165mm² 2019.06
   5  Henan Jiyuan Iron and Steel Group
Co.,Ltd.

河南济源钢铁(集团)有限公司
Reconstruction of No. 3 continuous casting machine (R8m, four-strand, four-machine)
R8m
四机四流3#连铸机改造
R8m-4-4 150mm²165mm² 2019.08
   6  Shanxi Xintai Steel Co.,Ltd.
山西新泰钢铁有限公司
Construction of a new No. 2 continuous casting machine (R9m, six-strand, six-machine)
新建2#连铸机R9m六机六流
R9m-6-6 160mm²165mm² 2019.08
   7  Shanxi Tongcai Industry and Trade Co.,Ltd.
山西通才工贸有限公司
Construction of new R10m-8-8 billet continuous casting machine新建R10m-8-8方连铸机 R10m-8-8 165mm² 2019.10 
   8  Shanxi Jianlong Steel Co.,Ltd.
山西建龙钢铁有限公司
Pulling speed improvement for R8-6-6; 150mm² billet continuous casting machine
R8-6-6
150方连铸机提拉速改造
R8m-6-6 150mm² 2020.05
   9  Fushun New Iron & Steel Co. LTD
抚顺新抚钢有限责任公司
Construction of three new seven-machine seven-strand continuous casting machines
新建377流连铸机
R10m-7-7 165mm² 2020.06
   10  Shanxi Xintai Steel Co.,Ltd.
山西新泰钢铁有限公司
Reconstruction of R9m six-machine six-strand continuous casting machine
改建R966流连铸机
R9m-6-6 160mm² 2020.06
   11  Tangshan Donghua Iron and Steel Enterprise Group Co., Ltd.
唐山东华钢铁有限公司
Pulling speed improvement for two seven-machine seven-strand continuous casting machines
2
77流连铸机提拉速改造
R9m-7-7 150mm²165mm² 2020.06
   12  Shanxi Jianlong Steel Co.,Ltd.
山西建龙钢铁有限公司
Pulling speed improvement for R9m seven-machine seven-strand continuous casting machine
R9m7
7流连铸机提拉速改造
R9m-7-7 150mm²165mm² 2020.07
   13  Ningxia Iron and Steel (Group) Co.,Ltd.
宁夏钢铁集团有限公司
Construction of new R8m six-machine six-strand 165mm² billet continuous casting machine
新建 R866165方连铸机
R8m-6-6 165mm² 2020.08
   14  Shandong Guangfu Group Co. LTD
山东广富集团有限公司
Construction of new R12m six-machine six-strand large round bloom continuous casting machine
新建 R1266流大圆坯连铸机
R12m-6-6 ¢300¢450¢500¢600 2020.09
   15  Wulanhot Steel And Iron Factory
乌兰浩特钢铁有限责任公司
Construction of hot charging system for new rolling mill under Jingye capacity replacement project
敬业产能置换新建轧钢厂热送系统
R10-8-8 165mm² 2020.05
   16  Ningxia Iron and Steel (Group) Co.,Ltd.
宁夏钢铁(集团)有限责任公司
Construction of new R10m five-machine five-strand continuous casting machine新建R10M五机五流连铸机 R10m-5-5 165mm² 2020.11
   17  Shanxi Tongcai Industry and Trade Co.,Ltd.
山西通才工贸有限公司
Construction of new No. 2 R9m eight-machine eight-strand continuous casting machine
新建2#R9m88流连铸机
R9m-8-8 160mm²165mm² 2021.01
   18  Shandong Xiwang Special Steel Co.,Ltd.
山东西王钢铁有限公司
Square-to-round conversion project for 12m radius continuous casting machine
12
米弧连铸机方改圆项目
R12m-4-4 ¢310¢400¢450¢500 2020.12
   19  Shiheng Special Steel Group Co.,Ltd.
山东石横特钢集团有限公司
Construction of new R12m seven-machine seven-strand continuous casting machine新建R12m七机七流连铸机 R12m-7-7 165mm²220x280260x320 2021.01
   20  Yuxi Yukun Iron and Steel Co.,Ltd.
云南玉溪玉昆钢铁集团有限公司
Construction of new No. 2, 3, 5, and 6 R11m seven-machine seven-strand 165mm² billet continuous casting machines
新建2#3#5#6#R11米七机七流165方连铸机
R11m-7-7 165mm²/180mm²/220x280 2021.02
   21  Henan Jiyuan Iron and Steel Group Co.,Ltd.
河南济源钢铁(集团)有限公司
Strand addition modification project for No. 4 R8m continuous casting machine
4#R8m
加流改造项目
R8m-5-5 165mm²200mm² 2021.03
   22  Shiheng Special Steel Group Co.,Ltd.
山东石横特钢集团有限公司
Pulling speed improvement for R9m six-machine six-strand continuous casting machine
提拉速改造R9m六机六流连铸机改造
R8m-6-6 165mm² 2021.06
   23  Shanxi Tongcai Industry and Trade Co.,Ltd.
山西通才工贸有限公司
Addition of 165mm² cross-section for No. 1 caster machine 1#机浇铸机增加165方断面改造 R10m-6-6 160mm²165mm² 2021.05
   24  Anhui Shoumin Dachang Metal Materials Co.,Ltd.安徽首矿大昌金属材料有限公司 Pulling speed improvement project for No. 1 R10m ten-machine ten-strand billet continuous casting machine
1#R10m10
10流方坯连铸机提拉速改造项目
R10m-10-10 165mm² 2021.08
   25  Fushun New Iron & Steel Co. LTD
抚顺新抚钢有限责任公司
Addition of roller table
增加辊道输送铸坯转盘
R10m-7-7 165mm² 2021.09
   26  Jingye Iron And Steel Co.,Ltd.
敬业钢铁有限公司
Replacement of ladle turret support for No. 3 continuous casting machine
3#
连铸机钢包回转支撑更换
    2021.09
   27  Jianlong Xilin Iron And Steel Co.,Ltd.
建龙西林钢铁有限公司
Speed-up upgrade and modification for No. 2 R8m six-machine six-strand continuous casting machine
2#R8m6
6流连铸提速升级改造
R8m-6-6 150mm²165mm² 2021.11
   28  Shanxi Zhongyang Iron & Steel Co.,Ltd.
山西中阳钢铁有限公司
Overall upgrade and modification project for No. 2 continuous casting machine in Second Steelmaking Plant
二炼钢2#连铸机整体升级改造项目
R8m-5-5 165mm² 2022.01
   29  Henan Xinjinhui Stainless Steel Industry Co.,Ltd.
河南鑫金汇不锈钢产业有限公司
Ladle turret upgrade and modification project
大包回转台升级改造项目 
    2022.08
   30  Shanxi Xintai Steel Co.,Ltd.
山西新泰钢铁有限公司
Design, supply, and installation of new No. 4 rectangular bloom continuous casting machine
新建4#矩形坯连铸机设计、供货、安装
R12m-5-5 220x230220x280;220x320 2022.09
   31  Zhejiang Qingshan Iron and Steel
Co.,Ltd.

浙江青山钢铁有限公司
Modification of pushing machine
推钢机、捞钢机改造
    2022.10 
   32  Baosteel Group Xinjiang Bayi Iron & Steel Co.,Ltd.
新疆八一钢铁股份有限公司
Product optimization modification project for No. 2 continuous casting machine of 150mm production line
150
产线2#连铸机品种优化改造工程
R9m-8-8 150mm² 2022.11
   33  Shandong Iron and Steel Group Yongfeng Lingang Co.,Ltd.
莱钢永锋临港有限公司
Strand addition modification for No. 2 continuous casting machine in steelmaking plant
炼钢厂2# 连铸机加流改造
R10.5m-8-8 165mm² 2022.12
   34  Shiheng Special Steel Group Co.,Ltd.
山东石横特钢集团有限公司
Construction project for new R12m seven-machine seven-strand billet/bloom continuous casting machine
新建R12m77流方矩坯连铸机项目
R12m-7-7 165mm²220x280;220x320 2023.01
   35  Baosteel Group Xinjiang Bayi Iron & Steel Co.,Ltd.
新疆八一钢铁股份有限公司
Cold bed modification project for rectangular blooms of No. 2 continuous casting machine on 150mm production line
150
产线2#连铸机矩坯冷床改造项目
    2023.05
   36  Baosteel Group Xinjiang Bayi Iron & Steel Co.,Ltd.
新疆八一钢铁股份有限公司
Reinforcement and optimization design for cold bed and bloom turnover device of No. 1 continuous casting machine on 15t production line
15t
产线1#连铸机冷床及翻钢机加固优化设计
R9m-8-8 150mm² 2023.05
   37  Russia VTZ Volgograd steel pipe
plant

俄罗斯 VTZ 伏尔加格勒钢管厂
Overall upgrade and modification project for large square/round bloom continuous casting machine
大方圆坯连铸机整体升级改造项目
R14m-4-4 150mm²165mm²200x200;220x240;320x380;¢150¢160¢180¢210¢250¢300¢350¢420¢500 2023.06
   38  Shanxi Huaxinyuan Iron & Steel Group Co., Ltd.
山西华鑫源钢铁集团有限公司
Construction of new R9m eight-machine eight-strand billet continuous casting machine
新建R9m八机八流方坯连铸机
R9m-8-8 150mm² 2023.07
   39  Heilongjiang Jianlong Iron & Steel Co. LTD
黑龙江建龙钢铁有限公司
Cross-section addition, productivity increase, and pulling speed improvement for round bloom continuous casting machine in steelmaking
炼钢圆坯连铸机增加断面提产拉速改造
R10m-6-6 ¢150¢160¢180¢210¢250¢300 2023.08
   40  Shandong Haoyu Heavy Industry Co., LTD
山东浩宇重工有限公司
Construction of new R14m four-machine four-strand 380-600mm round bloom continuous casting machine
新建R14米四机四流380--600圆连铸机
R14m-4-4 ¢300¢350¢450¢500¢600 2023.12
   41  Fushun New Iron & Steel Co. LTD
抚顺新抚钢有限责任公司
Safety optimization and upgrade of supporting equipment for No. 2 continuous casting machine in steelmaking plant
炼钢厂2#连铸机配套设备安全优化升级改造
R12m-6-6 165mm² 2024.01
   42  Henan Jiyuan Iron and Steel Group Co.,Ltd.
河南济源钢铁(集团)有限公司
Addition of round bloom cross-section project for No. 3 R8-5-5 billet continuous casting machine
3#R8-5-5
方坯连铸机新增圆坯断面工程
R8m-5-5 ¢150¢160¢180¢210;150mm² 2024.02
   43  Henan Jiyuan Iron and Steel Group Co.,Ltd.
河南济源钢铁(集团)有限公司
Tundish induction heating modification project for No. 5 continuous casting machine in First Steelmaking Plant
一炼钢5#连铸机中包感应加热改造项目
R16m-3-3   2024.04
   44  Shanxi Tongcai Industry and Trade Co.,Ltd.
山西通才工贸有限公司
Quality improvement modification for specialty steels on No. 3 continuous casting machine
3#
连铸机品种钢提质改造
R9m-8-8 160mm²165mm² 2024.06
   45  Shandong Iron and Steel Group Yongfeng Lingang Co.,Ltd.
莱钢永锋临港有限公司
Construction of new No. 5 R10 eight-machine eight-strand high-quality/special steel continuous casting machine (square/round)
新建5#R1088流优特钢连铸机(方圆)
R10m-8-8 165mm²¢150¢160¢180¢210 2024.09
   46  Xinjiang Kunyu Steel Co., LTD
新疆昆玉钢铁有限公司
Construction project for new R8m three-machine three-strand thin slab continuous casting machine
新建R8m33流小板坯连铸机项目
R8m-3-3 165x400;165x500;165x600;165x700;165x750 2024.01
   47  Shandong Iron and Steel Group Yongfeng Lingang Co.,Ltd.
莱钢永锋临港有限公司
Addition of round bloom cross-section modification for No. 1 billet continuous casting machine
山东莱钢永锋1#方坯连铸机增加圆坯断面改造
R10.25m-5-5 ¢150¢160¢180¢210;150mm² 2025.01
   48  Baosteel Group Xinjiang Bayi Iron & Steel Co.,Ltd.
新疆八一钢铁股份有限公司
Direct rolling and hot charging project
宝武新疆八钢直轧热送项目
    2025.04
   49  Zhejiang Qingshan Iron and Steel
Co.,Ltd.

浙江青山钢铁有限公司
Strand addition project for stainless steel continuous casting machine
不锈钢连铸机加流项目
R10m-4-4 ¢240 2025.04
   50  Shandong Guangfu Group Co. LTD
山东广富集团有限公司
Round bloom addition project
方坯加圆坯项目
R8m-3-3 ¢160¢180¢200; 2025.05
   51  Yuxi Yukun Iron and Steel Co.,Ltd.
云南玉溪玉昆钢铁集团有限公司
Upgrade from quality steel to special steel modification project for No. 3 continuous casting machine
3#
连铸机优转特改造项目
R11m-7-7 180mm²220x280 2025.06
   52  Jianlong Group Shuangyashan Iron & Steel Co., Ltd
建龙集团双鸭山钢铁有限公司
Pulling speed improvement project for round bloom continuous casting machine
圆坯连铸机提拉速改造项目
R12m-5-5 ¢150¢160¢180¢210;¢310 2025.07
   53  Jianlong Group Acheng Iron & Steel Co., Ltd.
建龙集团阿城钢铁有限公司
Strand addition project for slab continuous casting machine
扁坯连铸机加流项目
R12m-5-5 165x400--550 2025.07
   54  Jianlong Group Acheng Iron & Steel Co., Ltd.
建龙集团阿城钢铁有限公司
Pulling speed improvement project for adding 130mm² and 150mm² cross-sections to small billet caster
小方坯加130方、150方提拉速改造项目
R10m-6-6 130mm²150mm² 2025.07
   55  Shaanxi Longmen Iron & Steel Co., Ltd.
陕西龙门钢铁有限公司
R10-7-7, addition of round bloom conversion project
R10-7-7,
增加圆坯改造工程
R10m-7-7 ¢150¢160¢180¢210;¢250¢280170x170 2025.10 
   56  Heilongjiang Jianlong Iron & Steel Co. LTD
黑龙江建龙钢铁有限公司
Round Billet Caster Capacity Increase Retrofit
炼钢厂圆坯连铸提产改造
R12m-5-5 ¢150;¢160;¢180;¢210;¢310 2025.08.15
   57  Fushun New Iron & Steel Co. LTD
抚顺新抚钢有限责任公司
2# Caster New Transfer Car EPC
炼钢厂
 2#连铸机新增一台移钢车(设计、供货、安装、调试)工程EPC 总承包
    2025.09.13
   58  Henan Jiyuan Iron and Steel Group Co.,Ltd.
河南济源钢铁(集团)有限公司
2nd Steelmaking 4# Caster Tundish Expansion
二炼钢
4#连铸机中包扩容改造项目
R10m-6-6   2025.09.20
   59  Jiangsu Jingye Steel Co., Ltd.
江苏敬业钢铁有限责任公司
Export Billet Modification
出口钢坯改造项目
R8m-5-5 130mm²150mm² 2025.10.31
   60  SMS Concast (Shanghai) Trading Co., Ltd.
西马克康卡司特贸易(上海)有限公司
Jiyuan 2# Caster Retrofit
济源
2#连铸机改造项目
R10m-8-8 150mm²165mm²180mm²200mm² 2025.09.26
   61  Shaanxi Longmen Iron & Steel Co., Ltd.
陕西龙门钢铁有限公司
Run-out Roller Table / Walking Beam Cooler / Hydraulic System / Automatic Tilter
出坯辊道、步进冷床、液压系统、自动翻转
R10m-8-8 ¢150;¢160;¢180;¢210;¢250;¢280;170x170 2025.11.20
   62  Shandong Linhai High-End Equipment Technology Co., Ltd.
山东琳海高端装备科技有限公司
1# Machine Spray System Retrofit
 1#
机喷淋系统改造项目
    2025.11.30
   63  Jianlong Group Acheng Iron & Steel Co., Ltd.
建龙集团阿城钢铁有限公司
200mm Square Billet Retrofit
200
方改造项目
R10m-6-6 200mm² 2026.02.10
   64  Anhui Shoukuang Dachang Metal Materials Co., Ltd.
安徽首矿大昌金属材料有限公司
2# Billet Caster Secondary Cooling Upgrade
炼钢
2#方坯连铸二冷冷却改喷雾冷却方式项目
R10m-12-12 150mm² 2026.02.28
   65  Tangshan Jumei Trading Co., Ltd.
唐山市聚美商贸有限公司
Design, supply, and installation of a walking beam cooling bed system for the steelmaking plant at Yingkou Xinjing Steel
营口鑫晶钢铁有限公司炼钢厂步进冷床
R9m-8-8   2026.04.08
   66  Henan Jiyuan Iron and Steel Group Co.,Ltd.
河南济源钢铁(集团)有限公司
1st Steelmaking 1# & 2# Caster Upgradeof ladle turrets and tundish tilt systems
济源一炼钢
1#2#机升级改造大包回转台及中包倾翻项目
    2026.04.08
   67  Shandong Iron & Steel Group Yongfeng Lingang Co., Ltd.
山东钢铁集团永锋临港有限公司
5# Caster Upgrade Spare Parts
5
#连铸机升级改造备件
R10.25m-8-8 130mm²150mm² 2026.04.07
   68  Jianlong Group Acheng Iron & Steel Co., Ltd.
建龙集团阿城钢铁有限公司
200mm Square Billet Installation & Retrofit
阿城钢铁200方安装和改造
R10m-6-6 200mm² 2026.04.14
   69  Shanxi Tongcai Industry and Trade Co.,Ltd.
山西通才工贸有限公司
3# Machine modification and upgrade
3#
机改造
R9m-8-8 160mm² 2026.04.28
           
Address: No. 2157 Hunan Road, Pudong New Area, Shanghai   
Factory Address: No.381, Longtan South Road, Tai'an, Shandong, China
Website:www.shanghaitianji.com
Contact Person:Mr. Xue Mr. Chen Mr. Li    
Contact Way:xuemin@shtjmt.com chenpuqing@shtjmt.com lishuxiong@shtjmt.com